Data Quality82%
MASS(Military Archive Scoring System)
ⓘ Regardless of era, the same scoring system applies to all units in the landing platform dock (lpd) category.
01 / Overview
Albion-class landing platform dock
Category
Country
Prime contractor
Production
2003–2005
Quantity
2
Unit Price (current)
$461.7M↗ 105% inflation · 1996→2025
Original Price
$225.0M (1996)
Operators
💰 PERFORMANCE / PRICE ASSESSMENT Methodology ↗
LANDING PLATFORM DOCK (LPD) · POST-COLD WAR
1
PERFORMANCE/PRICE
34
UNIT COST (2025 USD)
$461.7M
Original: $225.0M (1996)
Inflation: +%105
ⓘ Performance/Price and MASS score are computed across all units in the landing platform dock (lpd) category, regardless of era.
02 / Specs & Design
◎Identification7MOD.7
- Hull ClassificationLanding Platform Dock
- Ship TypeAmphibious warfare ship
- BuilderBAE Systems Marine
- Commissioned2003
- Ships in Class2
- RoleAfloat command platform for Amphibious Task Force and Landing Force Commanders
- In ServiceYes
◈Displacement & Dimensions5MOD.5
- Light Displacement14,000 t
- Full Load Displacement19,560 t
- Length176 m
- Beam28.9 m
- Draft7.1 m
▣Capacity5MOD.5
- Troop Capacity405
- Vehicle Capacity67
- Well DeckYes
- Landing Craft Carried8
- Ro-Ro CapabilityYes
◇Propulsion4MOD.4
- PropulsionIntegrated Electric
- Top Speed18 kn
- Range6,950.324
- Complement (crew)325
◆Aviation4MOD.4
- Embarked Helicopters3
- HangarYes
- Flight DeckYes
- Fixed-Wing / VSTOL0
▤Self-Defense3MOD.3
- CIWS2 × 20mm Phalanx
- Electronic WarfareNo
- Decoy LaunchersYes
⬢Cost1MOD.1
- Unit Cost225,000,000 USD
▲Fleet Status8MOD.8
- Completed2
- Active2
- Under Construction0
- Planned0
- Cancelled0
- Lost0
- Retired0
- Preserved0
03 / History
SERVICE LIFESPANStill in Service
- 2003Production started
- 2005Production ended
23
years in service
2
years in production
2
units produced
1
countries operating
ⓘ The producing country still actively operates it.
05 / MASS Score
LANDING PLATFORM DOCK (LPD) RANKING Landing Platform Dock (LPD) · Post-Cold War
MASS RANKINGSMASS ↗
1LANDING PLATFORM DOCK (LPD)1POST-COLD WAR · LANDING PLATFORM DOCK (LPD)41UNITED KINGDOM · ALL WEAPONS3PRICE · LANDING PLATFORM DOCK (LPD)106PRICE · ALL WEAPONS10PERFORMANCE/PRICE · LANDING PLATFORM DOCK (LPD)
ⓘ Rankings are within theLanding Platform Dock (LPD)category.
📖 TERMS ON THIS PAGE6terms
Decoy launchers are systems that deploy expendable countermeasures, such as acoustic or radar decoys, to mislead or divert incoming threats, enhancing survivability of naval vessels like LPDs.
The upper deck of an aircraft carrier, equipped for aircraft takeoff, landing, and maintenance operations.
Propulsion system combining gas turbines and diesel generators to provide both ship propulsion and electrical power.
Ro-Ro (Roll-on/Roll-off) capability enables vehicles and equipment to be driven on/off a ship via ramps, facilitating rapid vehicle loading/unloading for amphibious operations.
A recessed area at the stern of certain amphibious warships, allowing landing craft or vehicles to enter/exit the vessel directly from the water.
These terms are listed automatically because they appear on this page.full encyclopedia →
📚 Sources