Data Quality83%
MASS(Military Archive Scoring System)
ⓘ Regardless of era, the same scoring system applies to all units in the landing platform dock (lpd) category.
01 / Overview
Galicia-class landing platform dock
Category
Country
Prime contractor
Production
1997–2000
Quantity
2
Unit Price (current)
$132.0M
Operators
💰 PERFORMANCE / PRICE ASSESSMENT Methodology ↗
LANDING PLATFORM DOCK (LPD) · POST-COLD WAR
6
PERFORMANCE/PRICE
32
UNIT COST (2025 USD)
$132.0M
Inflation: +%0
ⓘ Performance/Price and MASS score are computed across all units in the landing platform dock (lpd) category, regardless of era.
02 / Specs & Design
◎Identification7MOD.7
- Hull ClassificationL-51, L-52
- Ship TypeLanding platform dock
- BuilderNavantia
- Commissioned1998
- Ships in Class2
- Roleamphibious warfare
- In ServiceYes
◈Displacement & Dimensions4MOD.4
- Full Load Displacement13,815 t
- Length160 m
- Beam25 m
- Draft5.9 m
▣Capacity6MOD.6
- Troop Capacity543
- Vehicle Capacity130 APCs or 33 MBTs
- Cargo Deadweight700 t
- Well DeckYes
- Landing Craft Carried4
- Ro-Ro CapabilityYes
◇Propulsion5MOD.5
- PropulsionDiesel
- Shaft Power16,405 kW
- Top Speed21 kn
- Range6,000
- Complement (crew)189
◆Aviation4MOD.4
- Embarked Helicopters6
- HangarYes
- Flight DeckYes
- Fixed-Wing / VSTOL0
▤Self-Defense3MOD.3
- Main Gun20 mm Oerlikon
- Electronic WarfareYes
- Decoy LaunchersYes
⬢Cost1MOD.1
- Unit Cost132,000,000 USD
▲Fleet Status8MOD.8
- Completed2
- Active2
- Under Construction0
- Planned0
- Cancelled0
- Lost0
- Retired0
- Preserved0
03 / History
SERVICE LIFESPANStill in Service
- 1997Production started
- 1998Entered service
- 2000Production ended
- 2008First deployment: Operation Atalanta
29
years in service
3
years in production
2
units produced
1
countries operating
ⓘ The producing country still actively operates it.
05 / MASS Score
LANDING PLATFORM DOCK (LPD) RANKING Landing Platform Dock (LPD) · Post-Cold War
MASS RANKINGSMASS ↗
8LANDING PLATFORM DOCK (LPD)6POST-COLD WAR · LANDING PLATFORM DOCK (LPD)49SPAIN · ALL WEAPONS5PRICE · LANDING PLATFORM DOCK (LPD)148PRICE · ALL WEAPONS11PERFORMANCE/PRICE · LANDING PLATFORM DOCK (LPD)
ⓘ Rankings are within theLanding Platform Dock (LPD)category.
📖 TERMS ON THIS PAGE7terms
Decoy launchers are systems that deploy expendable countermeasures, such as acoustic or radar decoys, to mislead or divert incoming threats, enhancing survivability of naval vessels like LPDs.
Type of internal combustion engine fuel, refined from crude oil.
Military action involving the use of electromagnetic spectrum to disrupt, deceive, or destroy enemy electronic systems.
The upper deck of an aircraft carrier, equipped for aircraft takeoff, landing, and maintenance operations.
Ro-Ro (Roll-on/Roll-off) capability enables vehicles and equipment to be driven on/off a ship via ramps, facilitating rapid vehicle loading/unloading for amphibious operations.
A recessed area at the stern of certain amphibious warships, allowing landing craft or vehicles to enter/exit the vessel directly from the water.
These terms are listed automatically because they appear on this page.full encyclopedia →
📚 Sources