Data Quality88%
01 / Overview
Großes Torpedoboot 1911
02 / Specs & Design
◎Identification7MOD.7
- Hull Classificationtorpedo boat
- Ship Typetorpedo boat
- Builder / ShipyardAG Vulcan Stettin / Germaniawerft
- Launched1911
- Commissioned1912
- Ships in Class26
- In ServiceYes
◈Displacement2MOD.2
- Light Displacement570 t
- Full Load Displacement697 t
▣Dimensions4MOD.4
- Length (overall)71.1 m
- Length (waterline)70.2 m
- Beam7.6 m
- Draft3.11 m
◇Complement1MOD.1
- Total Complement74
◆Propulsion8MOD.8
- PropulsionSteam Turbine
- Arrangement (CODAG/COGAG…)two direct‑drive steam turbines fed by three coal‑fired and one oil‑fired water‑tube boiler
- Number of Engines4
- Shaft Power12,499 kW
- Shafts / Screws2
- Top Speed32 kn
- Range1,190
- Nuclear-PoweredNo
▤Gun Armament3MOD.3
- Main Gun2 × 8.8 cm SK L/30 naval guns
- Main Gun Calibre88 mm
- Main Gun Count2
⬢Missile Armament3MOD.3
▲Underwater Warfare4MOD.4
- Torpedo Tubes4
- ASW CapabilityNo
- Hull-Mounted SonarNo
- Towed Array SonarNo
◎Aviation3MOD.3
◈Sensors & Combat Systems3MOD.3
▣Survivability4MOD.4
◇Fleet Status6MOD.6
- Completed26
- Planned26
- Cancelled0
- Lost8
- Retired18
- Preserved0
03 / History
SERVICE LIFESPANRetired
- 1911Production started
- 1912Production ended
- 1914First deployment: World War I
115
years in service
1
years in production
26
units produced
0
countries operating
ⓘ The producing country no longer actively operates it. 3 countries retired it.
04 / Operators
Operator Countries3country
Großes Torpedoboot 1911SALES1records
| Year | Buyer | Quantity | Amount | Present Value (2025) |
|---|---|---|---|---|
| 1912 | 2 | — | — |
ⓘ "Present Value" is an estimated amount adjusted for inflation.
05 / MASS Score
Not enough weapon data to rank this category.
📖 TERMS ON THIS PAGE1terms
A mechanical device that converts steam pressure into rotational energy, used to drive shipboard generators or propulsion systems.
These terms are listed automatically because they appear on this page.full encyclopedia →
📚 Sources