Data Quality83%
MASS(Military Archive Scoring System)
ⓘ Regardless of era, the same scoring system applies to all units in the tactical transports category.
01 / Overview
Tupolev Tu-107
Category
Country
Prime contractor
Production
1958–1958
Quantity
104
💰 PERFORMANCE / PRICE ASSESSMENT Methodology ↗
TACTICAL TRANSPORTS
—
PERFORMANCE/PRICE
25
UNIT COST (2025 USD)
—
ⓘ Performance/Price and MASS score are computed across all units in the tactical transports category, regardless of era.
02 / Specs & Design
◎General3MOD.3
- First Flight1958
- Crew6
- In ServiceNo
◈Powerplant3MOD.3
- Engine TypeMikulin RD-3M-500
- Number of Engines2
- Thrust (each)93.2
▣Performance5MOD.5
- Cruise Speed775 km/h
- Top Speed950 km/h
- Service Ceiling11,750 m
- Maximum Range3,300 km
- Range with Max Payload3,300 km
◇Cargo & Capacity4MOD.4
- Maximum Payload15,000 kg
- Troop Capacity70
- Paratroop Capacity70
- Rear Loading RampYes
◆Dimensions & Weights3MOD.3
- Length38.58 m
- Wingspan34.54 m
- Height11.53 m
▤Production1MOD.1
- Total Built1
03 / History
SERVICE LIFESPANRetired
- 1958Production started
68
years in service
0
years in production
104
units produced
04 / MASS Score
TACTICAL TRANSPORTS RANKING Tactical Transports
MASS RANKINGSMASS ↗
ⓘ Rankings are within theTactical Transportscategory.
📖 TERMS ON THIS PAGE1terms
A hinged rear fuselage section on military transport aircraft that lowers to enable direct loading/unloading of cargo or vehicles from the aircraft's tail.
These terms are listed automatically because they appear on this page.full encyclopedia →
📚 Sources