Data Quality88%
MASS(Military Archive Scoring System)
ⓘ Regardless of era, the same scoring system applies to all units in the tactical transports category.
01 / Overview
TA
Category
Prime contractor
Production
1925–1932
Operators
💰 PERFORMANCE / PRICE ASSESSMENT Methodology ↗
TACTICAL TRANSPORTS · INTERWAR PERIOD
8
PERFORMANCE/PRICE
80
UNIT COST (2025 USD)
—
ⓘ Performance/Price and MASS score are computed across all units in the tactical transports category, regardless of era.
02 / Specs & Design
◎General5MOD.5
- First Flight1924
- Service Entry Year1925
- Crew2
- Primary RoleMilitary transport
- In ServiceNo
◈Powerplant3MOD.3
- Engine TypeWright J-5 radial piston
- Number of Engines3
- Power (each, turboprop)164 kW
▣Performance1MOD.1
◇Cargo & Capacity2MOD.2
- Troop Capacity10
- Rear Loading RampNo
◆Aerial Refueling2MOD.2
▤Service History3MOD.3
- Production Start1925
- Production End1932
- Operational StatusRetired
03 / History
SERVICE LIFESPANRetired
- 1925Production started
- 1932Production ended
101
years in service
7
years in production
0
countries operating
ⓘ 12 countries retired it.
04 / Operators
Operator Countries12country
05 / MASS Score
TACTICAL TRANSPORTS RANKING Tactical Transports · Interwar Period
MASS RANKINGSMASS ↗
199TACTICAL TRANSPORTS8INTERWAR PERIOD · TACTICAL TRANSPORTS122PERFORMANCE/PRICE · TACTICAL TRANSPORTS
ⓘ Rankings are within theTactical Transportscategory.
📖 TERMS ON THIS PAGE1terms
Ability to take off and land on unpaved or short runways.
These terms are listed automatically because they appear on this page.full encyclopedia →
📚 Sources